Our case studies will give you an idea of the vast range of the inspection, testing and lifting projects we have carried out for the offshore, oil and gas, mining, construction, engineering and many other sectors. If you would like to know more about how we could help you, please contact us on tel. 01642 455 920 or by email. info@shaw-lifting.com.

Piston Pull Down Trunnion Testing

{tag_name_nolink}

In December 2015, Shaw Lifting were asked to carry out load testing to trunnions and lifting eyes on a fabricated piston pull down cabinet, as part of a Windfarm installation seafastening system .

Hydraulic Ram in place Anchor Blocks & Lifting Eyes

Shaw Lifting’s test engineers devised a way of testing the trunnions by fitting a hydraulic ram in the middle of the frame, which tested the integrity and function of the frame when in use.

Proof Load testing of Anchor Blocks and Lifting Eyes were also carried out using calibrated Hydraulic Equipment as part of the same job.